PRODUCTS
SEARCH
CONTACT US
Cixi Fuhai Junlai Electric Appliances Factory
Contact person: Mr. Li
Tel: 0574-63593277
Fax: 0574-63593277
Address: Xinpuxi Industrial Area, Cixi City, Zhejiang
Website:www.cxjunlai.com
·NEWS
CURRENT POSITION:HOME > NEWS
Industrial Heaters mainly for large space heating
Date: 2014/8/4 15:09:44 Hits: 1320

The main purpose of industrial hot air for some commercial and industrial sites and buildings and bridges were some large square space heating can also be used to dry some industrial products. As the name implies, is the hot air of the fuel for heating the air. At present, a wide variety of heating methods: warm, radiant, hot air, convection and so on. Energy choices are many, the traditional coal-fired, gas, electric heating in general, the current rise in oil and gas heating. In various heating methods, the air heating is more comfortable, while emerging as an industrial fuel hot air an air heating. Fuel Heaters also can provide clean, dry hot air, the entire space heating, temperature uniformity. It has a heated quickly, fast heat flow advantages. 

Diverse styles safety first, depending on your environment and space size selection 

Heaters range 

Factory floor, materials warehouse, moisture drying, partial heating 

Construction sites, roads and bridges, cement conservation, outdoor heating 

Oil drilling, coal mining, de-icing antifreeze, equipment insulation 

Railway airports, yacht ship, paint drying, construction insulation 

Military equipment, command tents, mobile heating, convenient heating 

Greenhouse, stadium clubs, clean energy, fast heating 

Heaters purchase 

Heaters have a desktop, vertical, wall-mounted points, desktop Heaters small size, vertical hot air flowing lines, wall-mounted hot air to save space. Heaters generally attractive appearance, elegant, coupled with the red, dark gray and blue color in the shell, so that hot air quite stylish. However, in the purchase of hot air, but also the safety and security of the first, if such a machine to prevent overheating, over-current protection devices, whether they have dumped off function, especially the bathroom-type hot air must have waterproof, water splash features, it should be careful to check whether there is water mark on the machine. It should be noted that, with the Great Wall of China Electrotechnical Commission issued certification mark products with better quality assurance. Not seeking the most satisfactory style, but to the best of intrinsic quality and security, is the key to the selection of hot air. 

Heaters maintenance 

Hot air tank after driving for some time, the surface layer of foreign matter and dust, if not cleaned up, the impact of heat dissipation. Blower motor after a long run, to deal with motor maintenance and replacement, this procedure must be performed by a professional judge and maintenance, you can not dismantle the motor, so easy to cause a short circuit and the motor does not turn, the light burned insurance, resulting in severe burn harness, on fire. Motor ventilation tube can not be removed, after removing easily cause the motor to overheat, burn. Variable speed motors can block resistance, such as long-term use one, two block, easy to make resistance blown, affecting the normal use, found that this problem should be replaced. Operating system after prolonged use, easy to manipulate cable aging deformation, so that manipulation is not flexible or not in place, do not go hard to move, to avoid damage to components. This problem should be found to the repair station to determine, and repair and replacement depending on the circumstances. Ventilation pipe is hot air of the 1st and the 2nd hose, due to prolonged use at high temperatures, very easy to aging cracks, found the problem, should be replaced to avoid leaks, causing the water temperature is too high, the engine cylinder head deformation . In other hose application leased vehicle matching hose, hose impatience inferior corrosion. 

The device is in use should be noted that these points: When winter temperatures below 0 windshield have a layer of ice and frost. When starting the engine, the water temperature rises above 40 , the manipulation identified by signs placed defrost position, the position of the indoor cycling into circulation, open the blower motor into third gear position, then the maximum motor speed, so its operation for 3-5 minutes, then you can put into a gear, second gear position according to defrost the situation. It is best not to leave the cab driver during the motor does not turn if found, should be immediately put the motor gear back to the closed position, to avoid the burn speed resistor. When the outside temperature is low, cab drivers and passengers for a long time, there will be frost glass, can be manipulated into position location and outdoor defrost cycle on, the motor can put a block or two block location, so you can put cream in addition to clean. When the external no sand and dust, can put into circulation outside, so that the cab fresh air. If dust or sand, and when the weather is too cold, the circulation into the interior circulation, avoiding sand and dust into the cab 

Security Precautions 

Fuel hot air duct and sent out of the air temperature can be very high, be careful to avoid burns; 

When air is used if they contain flammable, explosive gas, its concentration must be diluted to the explosion limit of 1/50 to 1/100 or less; 

Sudden accident directly by Jicha loved off, until the security is guaranteed only reset back to work. 

Check before using the machine and the power cord is connected properly and properly; 

Often clears the machine's dust, grease, stains; 

Regular inspection, cleaning fan inlet filter.


Return
ABOUT US | PRODUCTS | NEWS | EQUIPMENT | ONLINE | CONTACT US

   Copyright  2014 Cixi Fuhai Junlai Electric Appliances Factory. Powered by Yishang Network Inc.Tel0574-63593277
Address: Xinpuxi Industrial Area, Cixi City, Zhejiang